google.com, pub-9591068673925608, DIRECT, f08c47fec0942fa0 All Posts - MEDIA MONITORING OIL AND GAS -->

Complete Graphic Design Course™

Friday, December 22, 2017

7 Years Without Rules Play



After 7 years of having no clear rules, the government will soon issue a Regulation of the Minister of Energy and Mineral Resources that will regulate the obligation of oil and gas contractors to allocate funds for recovery of ex-oil and gas blocks.

After oil and gas exploitation activities in a field last, the contractor is supposed to perform the recovery activities of the former oil and gas wells.

However, until now it has not been clearly regulated on the obligations for contractor contractors to set aside the recovery funds of the former oil and gas wells. In fact, until 2025 there are 35 oil and gas contracts that will expire.

Referring to Article 17, Government Regulation no. 79/2010 on Recoverable Operating Costs, the Minister of ESDM and SKK Migas shall immediately coordinate the drafting and stipulation of the use of abandonment and site restoration (ASR) funds. The contractor set aside funds for ASR into joint account of SKK Migas.

In addition to Government Regulation 79, the Supreme Audit Agency (BPK) in the Central Government Financial Report 2015 recommends that the government develop and establish accounting policies related to the reserve of the environmental restoration funds stored in joint accounts.

BPK also recommended that the Head of SKK Migas provide strict sanctions to KKKS that do not reserve ASR funds. However, until now there is no specific regulation that regulates the use of ASR funds collected. On the other hand, by the end of 2017 there is the Mahakam Block which expires. In addition, there are eight oil and gas block contracts ending in 2018.

Secretary of the Directorate General of Oil and Gas of the Ministry of Energy and Mineral Resources Susyanto said that the draft Regulation of the Minister of Energy and Mineral Resources has entered the final stage. The plan, on Friday (22/12) will be refinement first.

According to him, the ESDM Ministry has requested input from business actors related to the substance set in the new beleid.

"The plan of Friday [today] is done the discussion of perfection," he said

However, he did not mention whether the certainty about the old contract that does not include the ASR's reserve obligations still has to set aside funds. Susyanto ensures the technical well closure and the implementation of international standards such as the advice of business actors will be regulated in the new regulations.

Previously, Director of Upstream Oil and Gas Upstream Business Development of the Ministry of ESDM Tunggal said that the obligation to carry out environmental restoration and permanent dismantling of facilities and facilities must be carried out by all contractors if the managed work area is out of contract.

Although some long-term contracts signed before the 90s have not been regulated on post-mining obligations, he believes the new contract to be signed will accommodate the obligations to the terms and conditions of the contract.

According to him, ASR's allowance for removal of funds will be required on new work areas, terminations or management transfers. 

    Separately contacted, Executive Director of Indonesian Petroleum Association (IPA) Marjolijn Wajong hoped that additional obligations for contractors who do not include the obligation to reserve ASR funds can be determined by agreement. In addition, he also hopes that the government to consider the conditions in each work area so that it still supports investment.

The existence of new or additional obligations when the KKS [cooperation contract] does not stipulate that such obligations can be carried out as long as there is agreement between the PSC contractors and the government so as not to contradict the principle of contract sanctity.

IN INDONESIA

7 Tahun Tanpa Aturan Main


Setelah 7 tahun tidak memiliki aturan yang jelas, pemerintah segera menerbitkan Peraturan Menteri ESDM yang akan mengatur soal kewajiban bagi kontraktor minyak dan gas bumi untuk mengalokasikan dana pemulihan eks blok minyak dan gas bumi.

     Setelah kegiatan eksploitasi migas di suatu lapangan berahir, kontraktor sudah seharusnya melakukan kegiatan pemulihan bekas sumur migas tersebut. 

      Namun, hingga saat ini belum diatur secara jelas tentang kewajiban bagi kontraktor kontrak kerja sama untuk menyisihkan dana pemulihan bekas sumur migas tersebut. Padahal, hingga 2025 ada 35 kontrak migas yang akan berakhir.

Mengacu pada Pasal 17, Peraturan Pemerintah No. 79/2010 tentang Biaya Operasi yang Dapat Dikembalikan, Menteri ESDM dan SKK Migas segera berkoordinasi menyusun dan menetapkan tata cara penggunaan dana pemulihan lahan pascatambang (abandonment and site restoration/ASR). Kontraktor menyisihkan dana untuk ASR ke dalam rekening bersama SKK Migas.

Selain Peraturan Pemerintah 79, Badan Pemeriksa Keuangan (BPK) dalam Iaporan Keuangan Pemerintah Pusat 2015 merekomendasikan agar pemerintah menyusun dan menetapkan kebijakan akuntansi terkait dengan pencadangan dana pemulihan lingkungan tersebut yang disimpan di dalam rekening bersama.

BPK pun merekomendasikan agar Kepala SKK Migas memberikan sanksi secara tegas kepada KKKS yang tidak mencadangkan dana ASR. Namun, hingga kini belum ada peraturan khusus yang mengatur tentang cara penggunaan dana ASR yang terkumpul. Di sisi lain, pada akhir 2017 terdapat Blok Mahakam yang habis masa kontraknya. Selain itu, ada delapan kontrak blok migas berakhir pada 2018.

Sekretaris Direktorat Jenderal Minyak dan Gas Bumi Kementerian ESDM Susyanto mengatakan bahwa draf Peraturan Menteri ESDM telah masuk tahap final. Rencananya, pada hari Jumat (22/12) akan dilakukan penyempurnaan terlebih dahulu.

    Menurutnya, Kementerian ESDM telah meminta masukan dari pelaku usaha terkait dengan substansi yang diatur dalam beleid baru tersebut.

“Rencananya hari Jumat [hari ini] dilakukan pembahasan penyempurnaan,” ujarnya 

Namun, dia tidak menyebut apakah kepastian tentang kontrak lama yang tidak mencantumkan kewajiban pencadangan dana ASR tetap harus menyisihkan dana. Susyanto memastikan teknis penutupan sumur dan penerapan standar internasional seperti saran pelaku usaha akan diatur dalam regulasi baru.

Sebelumnya, Direktur Pembinaan Usaha Hulu Minyak dan Gas Bumi Kementerian ESDM Tunggal mengatakan, kewajiban untuk melakukan pemulihan lingkungan dan pembongkaran fasilitas dan sarana secara permanen harus dilakukan seluruh kontraktor bila wilayah kerja yang dikelola habis masa kontraknya.

Kendati pada beberapa kontrak kerja sama lama yang ditandatangani sebelum tahun 90-an belum diatur tentang kewajiban pascatambang, dia menilai, kontrak baru yang nanti ditandatangani akan mengakomodasi kewajiban tersebut pada syarat dan ketentuan kontrak. 

Menurutnya, tanggung jawab penyisihan dana ASR akan diwajibkan pada wilayah kerja baru, terminasi maupun alih kelola.

    Dihubungi terpisah, Direktur Eksekutif Indonesian Petroleum Association (IPA) Marjolijn Wajong berharap agar kewajiban tambahan bagi kontraktor yang tidak mencantumkan kewajiban untuk mencadangkan dana ASR bisa ditetapkan berdasarkan kesepakatan. Selain itu, dia pun berharap agar pemerintah mempertimbangkan kondisi di masing-masing wilayah kerja sehingga tetap mendukung investasi.

Adanya kewajiban baru atau tambahan ketika KKS [kontrak kerja sama] tidak mengatur tentang kewajiban tersebut dapat dilakukan sepanjang adanya kesepakatan antara kontraktor KKS dan pemerintah sehingga tidak benentangan dengan prinsip contract sanctity [asas kesakralan kontrak].

Bisnis Indonesia, Page-30, Friday, Dec 22, 2017

Payment Scheme Not Set



PT Pertamina Hulu Energi ONWJ and PT Hulu Migas Jabar ONWJ have not set a method of payment for a 10% interest in the Offshore North West Java Offshore Block (ONWJ) located off the north coast of West Java.

Provincial Government of West Java and DKI Jakarta get 10% interest from ONWJ Block through PT Hulu Migas Jabar ONWJ The transfer of 10% of ONWJ shares has been agreed by PT Pertamina and West Java Provincial Government. As a result of the payment of 10% of the shares, all operational costs of ONWJ Block are covered by PT Pertamina Hulu Energi ONWJ as operator.

President Director of PT Pertamina Hulu Energi, a subsidiary of Pertamina, Gunung Sardjono Hadi, said that until now it has not set a payment mechanism of 10% of ONWJ Block's shares to be transferred to BUMD Migas Hulu West Java.

Mountain ensures that West Java BUMD can get 10% of net profit from the sale of ONWJ Block production. The transition of 10% of PHE ONWJ management to the BUMD is based on Minister of Energy and Mineral Resources Regulation no. 37/2016 on the Terms of Participating Interest 10% of the Oil and Gas Working Area. Meanwhile, BUMD does not need to pay cash value and manage parts.

BUMDs pay 10% of the right to manage by installments. On the other hand, the amount of installment will not reduce all profits obtained so that BUMDs can still benefit from the production of certain blocks that are deposited to the regional budget and expenditure (APBD).

"The payment mechanism in detail has not been discussed, but the bottom line and the resulting revenue will be reduced [cost] first then divided by 90%: 10%," he said.

According to him, after the transfer of shares of participation, because BUMD does not deposit the cost for the next operation, it bear all the burden of cost. In fact, under a contract signed on January 18, 2017, ONWJ Block implements a gross shareholder or gross split contract so that any investment and operating expenses will no longer be returned from the government.

In addition, there is an investment commitment in the first 3 years with a value of US $ 82.3 million and US $ 8.5 billion during the contract period of operation, ie 20 years. The plan, in 2018, it will invest US $ 537 million. The ONWJ Block oil production by the end of this year is projected at 71,522 barrels per day (bph) and 776 million standard cubic feet per day (MMscfd) gas.

IN INDONESIA

Skema Pembayaran Belum Ditetapkan


PT Pertamina Hulu Energi ONWJ dan PT Hulu Migas Jabar ONWJ belum menetapkan cara pembayaran 10 % saham partisipasi di Blok Offshore North West Java (ONWJ) yang berlokasi di lepas pantai utara Jawa Barat.

Pemerintah Provinsi Jawa Barat dan DKI Jakarta mendapatkan 10% saham partisipasi dari Blok ONWJ melalui PT Hulu Migas Jabar ONWJ Pengalihan 10 % saham ONWJ itu telah disepakati oleh PT Pertamina dan Pemerintah Provinsi Jawa Barat. Dampak dari belum ditetapkannya cara pembayaran 10% saham itu, seluruh biaya operasi Blok ONWJ ditanggung oleh PT Pertamina Hulu Energi ONWJ sebagai operator.

Presiden Direktur PT Pertamina Hulu Energi, anak perusahaan Pertamina, Gunung Sardjono Hadi mengatakan bahwa pihaknya hingga saat ini belum menetapkan mekanisme pembayaran 10% saham partisipasi Blok ONWJ yang dialihkan kepada BUMD Migas Hulu Jawa Barat.

Gunung memastikan BUMD Jawa Barat itu bisa mendapatkan 10% keuntungan bersih dari penjualan hasil produksi Blok ONWJ Peralihan 10% bagian kelola PHE ONWJ kepada BUMD mengacu pada Peraturan Menteri ESDM No. 37/2016 tentang Ketentuan Penawaran Participating Interest 10% pada Wilayah Kerja Minyak dan Gas Bumi. Adapun, BUMD tidak perlu membayar tunai nilai dan bagian kelola.

BUMD membayar 10% hak kelola dengan cara mengangsur. Di sisi lain, besarnya angsuran tidak akan mengurangi seluruh keuntungan yang diperoleh sehingga BUMD tetap bisa mendapatkan keuntungan dari hasil produksi blok tertentu yang disetor ke anggaran pendapatan dan belanja daerah (APBD).

“Mekanisme pembayaran secara detail belum dibahas, tetapi intinya dan revenue [laba] yang dihasilkan akan dikurangi cost [biaya] dulu lalu kemudian dibagi 90%:10%,” ujarnya.

Menurutnya, pasca peralihan saham partisipasi pun, karena BUMD tidak menyetor biaya untuk kegiatan operasi berikutnya, pihaknya menanggung seluruh beban biaya. Padahal, berdasarkan kontrak yang ditandatangani pada 18 Januari 2017, Blok ONWJ menerapkan kontrak bagi hasil kotor atau gross split sehingga setiap investasi dan biaya operasi tidak lagi mendapat pengembalian dari pemerintah.

Selain itu, terdapat komitmen investasi pada 3 tahun pertama dengan nilai US$ 82,3 juta dan US$ 8,5 miliar selama masa kontrak beroperasi, yakni 20 tahun. Rencananya, pada 2018, pihaknya akan menginvestasikan US$ 537 juta. Produksi minyak Blok ONWJ hingga akhir tahun ini diproyeksikan 71.522 barel per hari (bph) dan gas 776 juta kaki kubik per hari (million standard cubic feet per day/MMscfd).

Bisnis Indonesia, Page-30, Friday, Dec 22, 2017

Energi Mega Persada to up spending in 2018



Publicly listed oil and gas firm PT Energi Mega Persada (ENRG) plans to boost its capital expenditure to US$341 million in 2018 from a mere $60 million this year to increase the development of several blocks following a significant drop in its production throughout this year.

ENRG, affiliated with politician and tycoon Aburizal Bakrie, saw its oil and gas production average at 27,800 barrels of oil equivalent per day (boepd) between January and September, down 34.27 percent year-on-year. As a result, its revenues fell by 38 percent to $242.3 million.

The downward trend was triggered by the government’s decision to terminate ENRG’s contract in the Offshore Northwest Java (ONWJ) oil and gas block in January and fully shift the operatorship to Pertamina Hulu Energi (PHE),  a subsidiary of stateowned energy giant Pertamina.

Previously the block was jointly operated by PHE with a participating interest of 58.28 percent, ENRG with 36.72 percent and Kuwait Foreign Petroleum Exploration Company (Kufpec) with 5 percent.

“The loss of the ONWJ block has decreased our production and revenues by more than 30 percent,” ENRG president director lmam P Agustino said on Wednesday “Next year, we plan to boost our production by 10 percent through a number of development programs in several blocks, particularly the ones that have big potential but have yet to be exploited.”

ENRG has prepared $266 million from its own cash flow to start next year the second development phase of the Terang Sirasun Batur field in Kangean block, East Java, which produced 42 barrels of oil per day (bopd) and 118.7 million standard cubic feet per day (mmscfd) of gas throughout 2016.

Through such a plan, the firm expects to generate an additional 130 mmscfd of gas from the Kangean block starting in 2019. Furthermore, ENRG plans to allocate around $75 million to further develop the Bentu block in Riau. The block currently produces 60 mmscfd of gas, most ofwhich is delivered to Pertamina’s Dumai refinery in the same province.

“We have prepared a plan of further development [POFD] for the Bentu block so that we can produce an additional 60 mmscfd of gas from it. Hence, we expect to have a production rate of 120 mmscfd by the first quarter of 2019 at the latest,” Imam said.

In September, the government granted a 20-year extension to ENRG’s contract in the Bentu block, initially slated to expire in 2021. Hence, the company will operate the block until 2041 using the cost recovery scheme.

Moreover, ENRG has submitted a proposal to the government to extend its contract in the Malacca Strait block, slated to expire in 2020. However, when extended, the company intends to use the new gross split scheme in operating the block instead of maintaining the current cost recovery mechanism.

Then, it aims to start drilling activities at the Secanggang and Anggor fields in the Gebang block, North Sumatra, next year to boost production by an additional 60 mmscfd of gas in the future.

To improve its financial health, ENRG has announced a plan to restructure its debts Worth Rp 437.2 billion ($32.3 million) from five different creditors Greenwich lnternational, Stallion Investment, Ultrapro, PT Wira Cipta Perkasa and PT Prime Petro Services.

Jakarta Post, Page-13, Thursday, Dec 21, 2017

Obstacles to Oil and Gas Participation Rights to Local Government



The provincial government of East Kalimantan and the local government of Kutai Kartanegara are still at loggerheads over the 10% share distribution. The realization of 10% participating interest (PI) still encounters many problems. Of the three regions only one part of the participation has been realized, namely PT Pertamina Hulu Energy Offshore North West Java (PHE ONWJ) to PT Migas Hulu Jabar ONWJ.

As for the Mahakam Block and Muriah Block until now has not been done. Chairman of the Mahakam Block Management Task Force of the East Kalimantan Provincial Government, Ichwansyah stated, according to Minister of Energy and Mineral Resources Regulation no. 37/2016 on Terms of Participating Interest 10% Supply on Oil and Gas Working Area, East Kalimantan Provincial Government gets allotment (16.65% shares and 33.35% shares for Kutai Kartanegara Regency from PI 10% Mahakam Block) However, Kutai Kartanegara still asks for additional shares of Mahakam block from the central government.

The Mahakam block

"They want to ask for more, I do not know if 5% or more," they said.

Ichwansyah, stated that from the meeting of Mahakam Block with Deputy Minister of Energy and Mineral Resources Arcandra Tahar last week, Kutai Kartanegara's desire will be discussed with ESDM Minister Ignatius Jonan in the near future.

"There is a decision 1 day-2 today about the additional shares," he said.

Who will manage the portion of the shares of the Provincial Government is PT Mandiri Migas Pratama, BUMD East Kalimantan Provincial Government. While Kutai Kartanegara not know who will manage. It could later use BUMDs belonging to the Provincial Government first.

Director of Upstream Oil and Gas Upstream Development of the Ministry of ESDM Tunggal admitted, related to P1 10% Mahakam there is no agreement between Kutai Kartanegara and East Kalimantan Provincial Government.

While the special Central Java Provincial Government, Tunggal explain if PI 10% Blok Muriah is in Central Java Provincial Government. Furthermore, SKK Migas wrote to Petronas Carigali which is the operator of Muriah Block to offer PI 10% to BUMD Central Java.

"We do not yet know whether the Provincial Government of Central Java has proposed BUMD according to the regulations to SKK Migas," he added.

Corporate Affairs & Administration Petronas Carigali Indonesia Andiono Setiawan has not said much.

"We are waiting for the government's decision," he said

While 10% of PI Block ONWJ is smooth, Vice President of Relation PHE Aji Prayudi said, BUMD from West Java "picked up" by Pertamina in terms of investment cost "The government does not want to be as it used to, so according to Pertamina rules can hold," he said.

In addition to investment costs, another thing is the cash flow of Pertamina against ONWJ Block project because it is now using a gross split scheme. This year PHE ONWJ is targeting production of 30,000 barrels per day and gas 126.8 million standard cubic feet per day. Realization until Wednesday (20/12) 98% of the target 4%.

IN INDONESIA

Kendala Hak Partisipasi Blok Migas ke Pemerintah Daerah


Pemerintah Provinsi Kalimantan Timur dan Pemerintah Daerah Kutai Kartanegara masih berselisih tentang pembagian saham 10%. Realisasi penyerahan hak partisipasi atau participating interest (PI) 10% masih menemui banyak masalah. Dari tiga daerah hanya satu bagian partisipasi yang sudah terealisasi, yakni PT Pertamina Hulu Energi Offshore North West Java (PHE ONWJ) kepada PT Migas Hulu Jabar ONWJ. 

Sementara untuk Blok Mahakam dan Blok Muriah sampai saat ini belum dilakukan. Ketua Satuan Tugas Pengelolaan Blok Mahakam Pemerintah Provinsi Kalimantan Timur Ichwansyah menyatakan, sesuai Peraturan Menteri ESDM No. 37/2016 tentang Ketentuan Penawaran Participating Interest 10% pada Wilayah Kerja Minyak dan Gas Bumi, Pemerintah Provinsi Kalimantan Timur mendapatkan jatah (16,65% saham dan 33,35% saham untuk Kabupaten Kutai Kartanegara dari PI 10% Blok Mahakam. Namun, Kabupaten Kutai Kartanegara masih meminta tambahan saham Blok Mahakam dari pemerintah pusat.

"Mereka mau minta tambahan, saya tidak tahu apakah 5% atau lebih lagi. Intinya mereka minta kebijakan lain," ujarnya. 

Ichwansyah, menyatakan, dari hasil rapat Blok Mahakam dengan Wakil Menteri ESDM Arcandra Tahar pekan lalu, keinginan Kutai Kartanegara akan dibicarakan dengan Menteri ESDM Ignatius Jonan dalam waktu dekat. 

“Ada keputusan 1 hari-2 hari ini soal tambahan saham itu, " ungkap dia. 

Yang akan mengelola porsi saham bagian Pemerintah Provinsi itu adalah PT Mandiri Migas Pratama , BUMD Pemerintah Provinsi Kalimantan Timur. Sedangkan Kutai Kartanegara belum tahu siapa yang akan mengelola. Bisa saja nanti memakai BUMD milik Pemerintah Provinsi dahulu.

Direktur Pembinaan Usaha Hulu Migas Kementerian ESDM Tunggal mengakui, terkait P1 10% Mahakam memang belum ada kesepakatan antara Kutai Kartanegara dan Pemerintah Provinsi Kalimantan Timur. Sementara khusus Pemerintah Provinsi Jawa Tengah, Tunggal menjelaskan bila PI 10% Blok Muriah ada di Pemerintah Provinsi Jawa Tengah. Selanjutnya SKK Migas menyurati Petronas Carigali yang merupakan operator Blok Muriah untuk menawarkan PI 10% ke BUMD Jawa Tengah. 

"Kami belum tahu apakah Pemerintah Provinsi Jateng sudah mengusulkan BUMD yang sesuai peraturan ke SKK Migas," imbuhnya.

Corporate Affairs & Administration Petronas Carigali Indonesia Andiono Setiawan belum banyak bicara. 

"Kami menunggu keputusan pemerintah," kata dia 

Sementara 10% PI Blok ONWJ sudah mulus, Vice President Relation PHE Aji Prayudi bilang, BUMD dari Jawa Barat "digendong" oleh Pertamina dalam hal biaya investasi "Pemerintah tidak mau lagi seperti dulu, jadi menurut aturan Pertamina bisa menggendong," kata dia. 

Selain biaya investasi, hal lain adalah cash flow Pertamina terhadap proyek Blok ONWJ ini karena kini menggunakan skema gross split. Tahun ini PHE ONWJ menargetkan produksi 30.000 barel per hari dan gas 126.8 juta standar kaki kubik per hari. Realisasinya sampai Rabu (20/12) 98% dari target 4%.

Kontan, Page-14, Thursday, Dec 21, 2017

PKPK Expects to Reach Rp. 24 Billion



PT Perdana Karya Perkasa Tbk hopes to book a better income next year. Director of Perdana Karya Perkasa Untung Haryono explained that his company targets business revenue next year to reach Rp 24 billion or increase by 100 percent compared to this year's revenue prediction.

The increase in operating revenues will be derived from two existing contracts and at least one new contract next year.

"The new project hopefully can be one that, because of multiyears, for three years. Partially finish that now," said Untung.

Issuer coded in the PKPK Indonesia Stock Exchange has been recorded holding two contracts consisting of contracts Tatun Wall Connection (Mechanical) Package of Total E & P Indonesie valued at USD 324.5 billion with a term until December 2018.

And fabrication Services Works for Santos (Madura Offshore) Pty Ltd valued at Rp 44.1 billion for January 2019. There are also four new tenders next year which will be the company's target.

The four projects consist of three tenders for oil and gas work and a construction tender. The next year's oil and gas tender comes from the offering of blanket fabricatioan and construction services (project) from Santos worth Rp 40 billion, blanket conctraction services (maintenance) from Santos worth Rp 40 billion and drilling location preparation from PT Greatwall, Drilling Asia Pacific worth "Rp 36 billion.

"It is expected that these three days (oil and gas) can get one," said Untung.

A construction auction will come from landfill and land preparation work for PT Pupuk Kaltim worth Rp 100 billion. The land preparation work for Pupuk Kaltim should not be a new job for PKPK.

"We want to try to get in there too, we have been able to project Pupuk Kaltim 2014 or 2015 for landfill and land preparation for this industry to build factories," said Untung.

In addition to oil and gas and construction projects, Untung said the company has no plans to try to develop new business. Understandably, the company is still experiencing losses until the end of 2017.

"Until the end of the year is still a loss as well, but we are still small, as of September still losses Rp 4 billion, Rp 2 billion in December 2010. Next year could be a surplus," said

So do not be surprised if the company also does not allocate capital expenditure or capital expenditure (capex) for next year.
"Because we have been losing a few years, so if suppose there is a need that is required from the tender it should have or at least if we do not have, we are looking for partners who have or lease," said Untung.

Untung said, the company is currently trying to reduce losses for better performance. Thus the Prime Karya Perkasa can develop the business.

"Hopefully, if we are back to normal, we will think about business development again," said Perdana Karya Perkasa, targeting to earn Rp 2.29 billion profit next year, but it is optimistic that the target can be achieved because the performance is getting better.

IN INDONESIA

PKPK Berharap Meraih Rp. 24 Miliar


PT Perdana Karya Perkasa Tbk berharap membukukan pendapatan yang lebih baik lagi di tahun depan. Direktur Perdana Karya Perkasa Untung Haryono menjelaskan, pihaknya menargetkan pendapatan usaha pada tahun depan bisa mencapai Rp 24 miliar atau naik sekitar 100% dibandingkan prediksi pendapatan tahun ini. 

Kenaikan pendapatan usaha ini akan didapat dari dua kontrak eksisting dan minimal satu kontrak baru di tahun depan. 

"Proyek baru mudah-mudahan bisa dapat satu itu, karena multiyears, selama tiga tahun. Sebagian menyelesaikan yang sekarang," kata Untung. 

Emiten berkode PKPK di Bursa Efek Indonesia ini tercatat telah menggenggam dua kontrak yang terdiri dari kontrak Tatun Wall Connection (Mechanical) Package dari Total E&P Indonesie senilai Rp 324,5 miliar dengan jangka waktu hingga Desember 2018. 

Dan pekerjaan  fabrication Services untuk Santos (Madura Offshore) Pty Ltd senilai Rp 44,1 miliar dengan jangka waktu Januari 2019. Ada juga empat tender baru di tahun depan yang akan menjadi target perseroan itu. 

Keempat proyek tergebut terdiri dari tiga tender pekerjaan migas dan satu tender konstruksi. Tender migas di tahun depan  berasal dari tender pekerjaan blanket fabricatioan and construction services (project) dari Santos dengan nilai Rp 40 miliar, pekerjaan blanket conctraction services (maintenance) dari Santos senilai Rp 40 miliar dan drilling location preparation dari PT Greatwall, Drilling Asia Pacific senilai "Rp 36 miliar. 

"Diharapkan Hari tiga ini (migas) bisa memperoleh salah satu," kata Untung. 

Sementara satu lelang konstruksi akan berasal dari pekerjaan pengurukan dan persiapan lahan untuk PT Pupuk Kaltim senilai Rp 100 miliar. Pekerjaan persiapan lahan untuk Pupuk Kaltim ini seharusnya bukan pekerjaan baru bagi PKPK. 

"Kami mau mencoba masuk ke situ juga. Kami pernah dapat proyek Pupuk Kaltim tahun 2014 atau 2015 untuk pengurukan dan persiapan lahan untuk industri ini membangun pabrik," kata Untung.  

Selain proyek migas dan konstruksi, Untung bilang perseroan ini belum memiliki rencana untuk mencoba mengembangkan bisnis baru. Maklum, perseroan ini masih mengalami kerugian hingga akhir tahun 2017. 

"Sampai akhir tahun masih rugi juga, tapi kami sudah semakih kecil. Per September masih rugi Rp 4 miliar, bulan Desember Rp 2 miliaran. Tahun depan sudah bisa surplus," kata 

Maka tidak heran jika perseroan juga tidak mengalokasikan belanja modal atau capital expenditure (capex) untuk tahun depan. 
"Karena kami beberapa tahun ini selalu rugi, jadi kalau misalkan ada kebutuhan yang dipersyaratkan dari tender itu harus memiliki atau minimal kalau kami tidak punya, kami mencari mitra yang punya atau sewa,"kata Untung.

Untung menyatakan, perseroan tersebut saat ini pun sedang berusaha untuk mengurangi kerugian agar kinerja bisa lebih baik. Dengan begitu Perdana Karya Perkasa bisa mengembangkan usaha. 

"Mudah-mudahan kalau sudah kembali normal, kami akan memikirkan pengembangan usaha lagi, katanya. Perdana Karya Perkasa pada tahun depan menargetkan bisa membuklikan laba senilai Rp 2,29 miliar. Untung optimistis, target tersebut bisa tercapai karena kinerja sudah semakin baik.

Kontan, Page-14, Wednesday, Dec 20, 2017

Apexindo Stands Contracts in Mahakam Block


Apexindo will budget capital expenditure of US $ 14 Million Dollar in the Next Year

PT Apexindo Pratama Duta Tbk next year will issue a capital expenditure allocation of US $ 14 million. The amount is equal to the value of capital expenditure this year, which is allocated for maintenance capex.

Pretycia Darma, Manager of Corporate Finance and Investor Relations of Apexindo, said that the company is still budgeting the same capital expenditure for maintenance of capital expenditure this year so that there is no "major investment" in 2018.

"We have no plans for the purchase of new rigs, which we prioritize now is optimize the utilization of existing rigs," he said.

According to him, the specification of flat rig issuer coded APEX.di Indonesia Stock Exchange (IDX) can be directed to work on the geothermal power plant project. So that this company can optimize in the direction of electricity business.

Meanwhile, for APEX sea rigs claimed that the utility is rather low. "Land rigs are all able to geothermal because horse power" is very big to be utilized for geothermal projects, "he said.

Especially now for more geothermal projects are opened in order to megaproyek 35,000 megawatts, while in oil and gas very little. In addition, the contract period also tends to be short. As a result, the company must find new contracts to increase its utilization.

"The decrease in rig utilization makes this two-year income decrease because our automatic margin decreases," he said.

For information, APEX revenue until the third quarter of this year decreased 49.56% to US $ 44.11 million from the previous US $ 87.28 million. However, in terms of profit increased from US $ 10.83 million to US $ 13.75 million.

"Despite the decline in revenues, the company still maintains its performance, one of which is the cost efficiency with budget tightening," he explained.

Next year APEX until the 2018 quarter is working on four projects. The amount will increase, when entrepreneurs managed to win two rig tenders for the Mahakam Block.

Irawan Sigit, General Manager of APEX Marketing, said the four projects consist of three work on geothermal and one for oil and gas. Three geothermal projects, among others, Geehu Geothermal Power Plant (PLTP) Tulehu, PLTP Baturaden of Lahendong Geothermal Power Plant.

"One or two days rig 10 in Baturaden will run, now is endurance test," he said.

The current contract target focuses on securing the Mahakam contract. If at the end of this month Apexindo gets a contract from the Mahakam Block then the utilization will increase.

"Existing current contracts for marine rigs are Maam Rigs in Mahakam, but if we talk our total rigs from the sea and land side there will be four rigs that will operate in the first quarter of next year," he added.

For the record, throughout 2017, Apexindo drilled 13 wells in the Mahakam Block during the transition from Total to Pertamina. Therefore, next year APEX performance will still be conservative, because there is no stimulus from oil and gas industry. Practically Apexindo will rely on new contracts in Mahakam and geothermal alone.

"In terms of price depends on oil prices and budget KKKS. Our expectation as a company performance is at least equal to this year or better, "he continued.

IN INDONESIA

Apexindo Menggadang Kontrak di Blok Mahakam

    Apexindo akan menganggarkan belanja modal US$ 14 Juta Dolar di Tahun Depan

PT Apexindo Pratama Duta Tbk pada tahun depan akan menggeluarkan alokasi belanja modal sebesar US$ 14 juta. Jumlah tersebut sama dengan nilai belanja modal pada tahun ini, yang dialokasikan  untuk maintenance capex.  

Pretycia Darma, Manager Corporate Finance dan Hubungan lnvestor Apexindo menyampaikan pihaknya memang masih menganggarkan belanja, modal yang sama karena sifatnya untuk maintenance belanja modal pada tahun ini sehingga, tidak ada "major investment" di 2018. 

"Kami tidak memiliki rencana untuk pembelian rig baru. Yang kami prioritaskan saat ini adalah optimalkan utilisasi rig-rig yang ada," ujarnya.

Menarikanya, spesifikasi rig datar emiten berkode APEX di Bursa Efek Indonesia (BEI) ini bisa diarahkan untuk menggarap proyek pembangkit listrik geotermal. Sehingga perusahaan ini bisa mengoptimalkan ke arah bisnis listrik itu. 

    Sedangkan, untuk rig laut APEX mengaku utilisasinya agak rendah "Rig darat memang semuanya bisa ke geotermal karena horse power" sangat besar jadi utilisasinya untuk proyek geotermal," ujarnya. 

Apalagi saat ini untuk geotermal lebih banyak proyek yang dibuka dalam rangka megaproyek 35.000 megawatt, sedangkan di migas sangat sedikit. Selain itu, periode kontraknya juga cenderung singkat. Alhasil, perusahaan ini harus mencari kontrak-kontrak baru agar utilisasinya meningkat. 

"Penurunan utilisasi rig membuat pendapatan dua tahun ini mengalami penurunan karena otomatis margin kami turun," laniutnya. 

Sebagai informasi, pendapatan APEX sampai dengan kuartal III tahun ini menurun 49,56% menjadi US$ 44,11 juta dari sebelumnya US$ 87,28 juta. Namun dari sisi laba mengalami peningkatan dari US$ 10,83 juta menjadi US$ 13,75 juta. 

"Biarpun penurunan pendapatan,  perusahaan tetap mempertahankan kinerja. Salah satunya karena efisiensi biaya dengan pengetatan anggaran,"terangnya. 

Sementera tahun depan APEX sampai dengan kuartal 2018 mengerjakan empat proyek. Jumlah tersebut akan bertambah, saat pegusahaan berhasil memenangkan tender dua rig untuk Blok Mahakam.

Irawan Sigit, General Manager-Marketing APEX, mengatakan empat proyek tersebut terdiri dari tiga pengerjaan untuk geotermal dan satu untuk migas. Tiga proyek geotermal, tersebut  antara lain Pembangkit Listrik Panas Bumi  (PLTP) Tulehu, PLTP Baturaden dari PLTP Lahendong. 

"Satu atau dua hari rig 10 di Baturaden akan berjalan, sekarang sedang endurance test," ujarnya. 

Target kontrak saat ini fokus pada mengamankan kontrak Mahakam. Jika pada akhir bulan ini Apexindo mendapatkan kontrak dari Blok Mahakam maka utilisasi akan meningkat. 

"Eksisting kontrak saat ini untuk rig laut ada Rig Maera di Mahakam. Tetapi kalau berbicara total rig kami dari sisi laut dan darat itu akan ada empat rig yang akan beroperasi di kuartal I tahun depan," tambahnya. 

Sebagai catatan, sepanjang tahun 2017, Apexindo melakukan pengeboran 13 sumur di Blok Mahakam pada masa transisi dari Total ke Pertamina. Oleh karena itu, tahun depan kinerja APEX masih akan konservatif, karena belum adanya stimulus dari industri migas. Praktis Apexindo akan mengandalkan kontrak baru di Mahakam dan geotermal saja. 

“Dari sisi harga tergantung harga minyak dan bujet KKKS. Harapan kami sebagai perusahaan kinerja minimal sama dengan tahun ini atau membaik," lanjutnya.

Kontan, Page-14, Wednesday, Dec 20, 2017

Pertamina Closes 37 Illegal Wells



In the past year, PT Pertamina Asset 1 with Jambi Provincial Government has closed 37 holes or illegal or illegal oil wells in Pompa Air Village, Bajubang Sub-district, Batanghari Regency, Jambi.

Public Relations Manager of PT Pertamina Asset 1, Sugeng Wiharto said Pertamina and the provincial government together with the joint team that has been made a Decree (SK) by the Governor of Jambi as the team closing the oil wells, last closing as many as 13 illegal wells run by the community and migrants there.

Previously, the team formed by the Governor of Jambi has been doing several times the closure of illegal wells in Pompa Air Village. The first closure of the well was held on 28 April to 3 May 2017 where the team managed to close 16 wells, despite the resistance from the public.

Then on May 25, 2017 re-implemented closure of six wells so that a total of 22 wells successfully closed. Then on October 2nd, 2017, re-closing the four wells and accompanied by the delivery of social assistance to the people of Pompa Air Village.

Sugeng asserted, however, illegal drilling activities are still going on, and even last there are thirteen illegal wells estimated to produce 3-4 drums of crude oil per day which was officially closed by Vice Governor of Jambi.

The step was taken as a follow up of the curbing of illegal oil wells in Pompa Air Village, Bajubang Sub-district, Batanghari District, Illegal Drilling Closure Team established based on the Decree of the Governor of Jambi on 26 April 2017 re-closing 13 existing wells.

IN INDONESIA

Pertamina Tutup 37 Sumur Ilegal


Dalam setahun terakhir ini PT Pertamina Asset 1 bersama  Pemerintah Provinsi jambi telah menutup sebanyak 37 lubang atau titik sumur minyak ilegal atau illegal drilling yang ada di Desa Pompa Air, Kecamatan Bajubang Kabupaten Batanghari, Jambi.

Manager Humas PT Pertamina Asset 1, Sugeng Wiharto mengatakan Pertamina dan pemerintah provinsi bersama tim gabungan yang telah di buatkan Surat Keputusan (SK) oleh Gubemur Jambi sebagai tim penutupan sumur minyak liar, terakhir menutup sebanyak 13 sumur ilegal yang dikelola masyarakat maupun pendatang disana.

Sebelumnya, tim bentukan Gubernur Jambi ini telah melakukan beberapa kali penutupan sumur-sumur illegal di Desa Pompa Air. Penutupan sumur tahap pertama dilaksanakan pada 28 April hingga 3 Mei 2017 dimana tim berhasil melakukan penutupan 16 sumur, meskipun mendapat perlawanan dari oknum masyarakat.

Kemudian pada 25 Mei 2017 kembali dilaksanakan penutupan enam sumur sehingga total 22 sumur berhasil ditutup. Selanjutnya pada 2 Oktober 2017 dilakukan kembali penutupan empat sumur dan disertai penyerahan bantuan sosial kepada masyarakat Desa Pompa Air.

Sugeng menegaskan, namun, kegiatan illegal drilling masih tetap berlangsung, bahkan terakhir ini terdapat lagi tiga belas sumur illegal yang diperkirakan menghasilkan 3-4 drum minyak mentah setiap harinya yang resmi ditutup oleh Wakil Gubemur Jambi.

Langkah tersebut diambil sebagai tindaklanjut dari penertiban kegiatan penambangan sumur-sumur minyak illegal di Desa Pompa Air, Kecamatan Bajubang, Kabupaten Batanghari, Tim Penutupan Illegal Drilling yang dibentuk berdasarkan Surat Keputusan Gubemur Jambi tanggal 26 April 2017 kembali melakukan penutupan 13 sumur yang ada.

Harian Bangsa, Page-4, Wednesday, Dec 20, 2017

ESDM Looking for Other Resources



The Ministry of Energy and Mineral Resources is still seeking gas supplies to replace supplies sourced from the North Sumatra Offshore Block (NSO) and North Sumatra B (NSB) for industries in North Sumatra.

Director of Program Development of the Ministry of Energy and Mineral Resources Budiyantono said it was looking for an alternative source to replace supplies from the North Sumatera Offshore Block and North Sumatra B which gas production from both blocks reached 60 million standard cubic feet per day (MMscfd).

According to him, there is an option to channel gas from Block A, Aceh or the result of regasification of liquefied natural gas (LNG) at Arun Terminal.

The NSO and NSB blocks have not been able to deliver gas until the repairs at the gas processing facility at Perta Arun Gas are completed. The reason, in order to be channeled to consumers, the gas must go through the process of separation of sulfur through sulfur removal unit (SRU). However, tertiary amine chemicals at the facility are not available.

The procurement of chemicals is still awaiting overseas shipments and manufacturers so that the unit cannot be revived. Gas drainage cannot be done because of repair and maintenance of facilities in Perta Arun Gas which is planned to last until 23 December 2017.

In addition, there is damage Instrument Analyzer tool in Unit Reaction Furnace whose procurement is still waiting until January 2018.

There is a shutdown from the NSO shutdown so that the gas needs in Medan and surrounding areas so disturbed, especially supplied by PT Perusahaan Gas Negara Tbk. We are looking for other sources and Block A Medco or LNG or others, "he said.

Both options allow for enforcement, but still have to consider the price factor because it comes from a different source. Meanwhile, until now it is still coordinating with PGN related constraints of gas distribution in North Sumatra. The reason, the government has set the price of gas supply from the NSO in the Minister of Energy and Mineral Resources Regulation no. 40/2016 on Gas Price for Specific Industries.

Especially for the Young Manure Fertilizer, upstream gas prices have been adjusted by introducing a new price formula with the component price of the product in it. For industries in Medan, gas prices are lowered from US $ 13.38 per MMBtu to US $ 9.95 per MMBtu as it diverts sources of supply from LNG to piped gas through EMR Ministerial Decree No.434 K / 12 / MEM / 2017.

President Director of PT Perta Arun Gas Budiyana said that the flow of gas will return to normal on January 1, 2018 after the procurement of chemicals and the completion of infrastructure improvements.

IN INDONESIA

ESDM Mencari Sumber Lain


Kementerian Energi dan Sumber Daya Mineral masih mencari suplai gas untuk menggantikan pasokan yang bersumber dari Blok North Sumatra Offshore (NSO) dan North Sumatra B (NSB) bagi industri di Sumatra Utara.

Direktur Pembinaan Program Kementerian ESDM Budiyantono mengatakan bahwa pihaknya sedang mencari alternatif sumber untuk menggantikan pasokan dari Blok North Sumatra Offshore dan North Sumatra B yang produksi gas dari kedua blok itu mencapai 60 juta kaki kubik per hari (million standard cubic feet per day/MMscfd).

Menurutnya, terdapat opsi untuk mengalirkan gas dari Blok A, Aceh atau hasil regasifikasi gas alam cair (liquefied natural gas/LNG) di Terminal Arun. 

Blok NSO dan NSB belum bisa mengalirkan gas sampai perbaikan di fasilitas pemrosesan gas di Perta Arun Gas selesai. Pasalnya, agar bisa dialirkan ke konsumen, gas harus melalui proses pemisahan sulfur melalui sulfur removal unit (SRU). Namun, bahan kimia amina tersier pada fasilitas tersebut tidak tersedia. 

Pengadaan bahan kimia itu masih menunggu pengiriman dan pabrikan di luar negeri sehingga unit tersebut belum dapat dihidupkan kembali. Pengaliran gas juga tidak bisa dilakukan karena adanya perbaikan dan pemeliharaan fasilitas di Perta Arun Gas yang rencananya berlangsung hingga 23 Desember 2017.

Selain itu, terdapat kerusakan alat Instrument Analyzer di Unit Reaction Furnace yang pengadaannya masih menunggu sampai Januari 2018. 

Ada gangguan shutdown dari NSO sehingga kebutuhan gas di Medan dan sekitarnya jadi terganggu khususnya yang disuplai oleh PT Perusahaan Gas Negara Tbk. Kita sedang mencari sumber lain apa dan Blok A Medco atau LNG atau yang lain,” ujarnya.

Kedua opsi tersebut, memungkinkan diterapkan, tetapi tetap harus mempertimbangkan faktor harga karena berasal dari sumber yang berbeda. Adapun, hingga saat ini pihaknya masih berkoordinasi dengan PGN terkait kendala penyaluran gas di Sumatra Utara. Pasalnya, pemerintah telah mengatur harga pasokan gas dari NSO pada Peraturan Menteri ESDM No. 40/2016 tentang
Harga Gas bagi lndustri Tertentu.

Khusus bagi Pupuk lskandar Muda, harga gas hulu telah mendapat penyesuaian dengan memberlakukan formula harga baru dengan komponen harga produk di dalamnya. Untuk industri di Medan, harga gas diturunkan dari US$ 13,38 per MMBtu menjadi US$ 9,95 per MMBtu karena mengalihkan sumber pasokan dari LNG ke gas pipa melalui Keputusan Menteri ESDM No.434 K/12/MEM/2017.

Direktur Utama PT Perta Arun Gas Budiyana mengatakan bahwa pengaliran gas akan kembali normal pada 1 Januari 2018 seusai pengadaan bahan kimia dan selesainya perbaikan infrastruktur.

Bisnis Indonesia, Page-30, Wednesday, Dec 20, 2017

PGN Sells Two LNG Cargoes from Bontang Refinery



PT Perusahaan Gas Negara Tbk (PGN) will sell two unlicensed state liquefied natural gas (LNG) cargoes. The source comes from the Sanga-Sanga Block. PGN targets the LNG sales process to start in the first half of 2018.

Previously, SKK Migas ordered PGN to sell state gas from Bontang LNG Plant owned by PT Badak NGL.

Head of Marketing and Product Development Division PGN Adi Munandir said, the initial stage PGN will only sell two cargoes.

"It is now being evaluated on the further assignment of uncommited cargo, Adi said.

The PGAS-coded issuer is holding a tender to sell two LNG cargoes to overseas buyers. However, PGN has not set the price.

"PGN makes sales through a tender mechanism with a variety of tenders and sellers. But no results, "said Adi.

For the management of domestic gas this year, PGN recorded gas distribution of 750 billion british thermal units per day (bbtud) from the electricity, industry to household sectors. If coupled with gas transmission, PGN managed gas reached 1,600 bbtud.

Next year PGN expects there will be a significant increase in gas management.

"PGN historically about 800 bbtud we have achieved and we hope to return the most optimum, but it depends on economic conditions and others," said Adi.

IN INDONESIA

PGN Menjual Dua Kargo LNG dari Kilang Bontang


PT Perusahaan Gas Negara Tbk (PGN) akan menjual dua kargo liquefied natural gas (LNG) bagian negara yang belum kontrak (uncommited). Sumbernya berasal dari Blok Sanga-Sanga. PGN menargetkan proses penjualan LNG tersebut bisa dimulai pada semester I-2018. 

Sebelumnya SKK Migas memerintahkan PGN menjual gas bagian negara dari Kilang LNG Bontang milik PT Badak NGL. Head of Marketing and Product Development Division PGN Adi Munandir mengatakan, tahap awal PGN hanya akan menjual dua kargo. 

"Sekarang sedang dievaluasi mengenai penugasan lebih lanjut terhadap uncommited kargo, kata Adi.

Emiten berkode PGAS itu sedang menggelar tender untuk menjual dua kargo LNG ke pembeli luar negeri. Namun, PGN belum menetapkan harga. 

“PGN melakukan penjualan melalui mekanisme tender dengan berbagai macam tender dan penjual. Tapi belum ada hasilnya," jelas Adi. 

Untuk pengelolaan gas domestik tahun ini, PGN mencatatkan distribusi gas sebanyak 750 billion british thermal unit per day (bbtud) yang berasal dari sektor kelistrikan, industri hingga rumah tangga. Jika ditambah gas transmisi, gas kelolaan PGN mencapai 1.600 bbtud. 

Tahun depan PGN berharap akan ada peningkatan pengelolaan gas yang cukup signifikan. 

"Secara historis PGN sekitar 800 bbtud pernah kami capai dan kami berharap bisa kembali paling optimum. Tapi itu tergantung kondisi perekonomian dan lain-lain," ujar Adi.

Kontan, Page-14, Tuesday, Dec 19, 2017