google.com, pub-9591068673925608, DIRECT, f08c47fec0942fa0 EMCL -->

Wikipedia

Search results

Showing posts with label EMCL. Show all posts
Showing posts with label EMCL. Show all posts

Friday, January 17, 2020

ExxonMobil Wants to Increase Production



ExxonMobil Cepu Limited (EMCL) is applying for an environmental impact analysis (Amdal) permit to produce oil to a maximum capacity of 235,000 barrels per day (BPD) in the Cepu Block. Their maximum production permit is currently 220,000 BPD.


EMCL has conducted a technical study with the Ministry of Environment and Forestry (KLHK). Furthermore, the company which is headquartered in Texas, United States (US), will hold a joint study with the community.

Louise McKenzie

"This process has many stages, but we hope that EIA will come out within a month or two," said Louise McKenzie, President of ExxonMobil Cepu Limited in Bojonegoro, East Java.


For information, the Cepu Block has two production sources namely the Banyu Urip Field and the Kedung Keris Field. EMCL acts as an operator. The company is partnering with Pertamina EP Cepu (PEPC) and the Cepu Block Participating Interest Cooperation Agency.

The Kedung Keris Field

The Kedung Keris Field appeared later in 2011 and is located east of the Banyu Urip Field. The project consists of a well site for the operation of a well and a 15 km underground pipeline connected to the Banyu Urip Central Processing Facility. Estimated oil reserves from the Kedung Keris Field reach 20 million barrels of oil.

Since November this year, EMCL began producing oil at the Kedung Keris Field. Production volumes in the early stages are around 5,000 BPD. They believe they can increase production volume to 10,000 BPD at peak production.


The Special Task Force for Upstream Oil and Gas Business Activities (SKK Migas) notes. The Cepu Block is now the backbone of the national oil production source with a contribution of around 25%. Even his position has shifted the Rokan Block managed by PT Chevron Pacific Indonesia.

At present, the Rokan Block produces around 190,000 BPD of oil. While the production of the Cepu Block has reached more than 216,000 BPD. Even though in 2018, the Rokan Block will still be the largest national contributor.

Dwi Soetjipto

"2019 has been overtaken by Exxon Cepu and at the same time Rokan continues to decline," said Dwi Soetjipto, Head of SKK Migas.

And it is proven that additional production from the Kedung Keris Field has further strengthened the position of the Cepu Block. SKK Migas predicts that by 2020 the block will still hold the main control of national oil production. The reason is that the production of the Rokan Block will still go down in line with the transition of management transfer approaching the end of the contract.

Banyu Urip Field

But until before the Amdal permit to increase maximum production is obtained, the total Cepu Block production from the two fields must not exceed 220,000 BPD. Banyu Urip Field oil production must consider additional production from the Kedung Keris Field.

IN INDONESIA

ExxonMobil Ingin Meningkatkan Produksi


ExxonMobil Cepu Limited (EMCL) sedang mengajukan izin analisis mengenai dampak lingkungan (amdal) agar bisa memproduksi minyak hingga kapasitas maksimal sebesar 235.000 barel per hari (bph) di Blok Cepu. Izin maksimal produksi mereka saat ini mencapai 220.000 bph.

EMCL telah rnelakukan kajian teknis dengan Kementerian Lingkungan Hidup dan Kehutanan (KLHK). Selanjutnya, perusahaan yang berkantor pusat di Texas, Amerika Serikat (AS), itu bakal menggelar kajian bersama dengan masyarakat. 

"Proses ini ada banyak tahapan, tetapi harapan kami amdal akan keluar dalam satu atau dua bulan ini," kata Louise McKenzie, Presiden ExxonMobil Cepu Limited di Bojonegoro, Jawa Timur.

Sebagai Informasi, Blok Cepu memiliki dua sumber produksi yakni Lapangan Banyu Urip dan Lapangan Kedung Keris. EMCL bertindak sebagai operator. Perusahaan tersebut bermitra dengan Pertamina EP Cepu (PEPC) dan Badan Kerjasama Participating Interest Blok Cepu. 

Lapangan Kedung Keris muncul belakangan pada 2011 dan terletak di sebelah timur Lapangan Banyu Urip. Proyek itu terdiri dari tapak sumur untuk operasi satu sumur serta pipa bawah tanah sepanjang 15 km yang tersambung dengan Fasilitas Pengolahan Pusat Banyu Urip. Perkiraan cadangan minyak dari Lapangan Kedung Keris mencapai 20 juta barel minyak.

Sejak November tahun ini, EMCL mulai memproduksi minyak di Lapangan Kedung Keris. Volume produksi pada tahap awal sekitar 5.000 barel BPH. Mereka yakin bisa menambah volume produksi hingga 10.000 bph pada saat puncak produksi. 

Satuan Kerja Khusus Pelaksana Kegiatan Usaha Hulu Minyak dan Gas Bumi (SKK Migas) mencatat. Blok Cepu kini menjadi tulang punggung sumber produksi minyak nasional dengan kontribusi sekitar 25%. Bahkan posisinya telah menggeser Blok Rokan yang dikelola PT Chevron Pacific Indonesia. 

Saat ini, Blok Rokan memproduksi sekitar 190.000 bph minyak. Sementara produksi Blok Cepu sudah lebih dari 216.000 bph. Padahal tahun 2018, Blok Rokan masih menjadi kontributor terbesar nasional. 

"Tahun 2019 sudah disalip oleh Exxon Cepu dan di saat yang sama Rokan terus decline,” tutur Dwi Soetjipto, Kepala SKK Migas.

Dan terbukti tambahan produksi dari Lapangan Kedung Keris semakin memperkuat posisi Blok Cepu. SKK Migas memprediksi, tahun 2020 blok tersebut tetap memegang kendali utama produksi minyak nasional. Pasalnya, produksi Blok Rokan masih akan turun seiring dengan masa transisi alih kelola menjelang
akhir kontrak. 

Namun sampai sebelum izin amdal untuk meningkatkan produksi maksimal diperoleh, total produksi Blok Cepu dari dua lapangan tidak boleh melebihi 220.000 bph. Produksi minyak Lapangan Banyu Urip harus mempertimbangkan tambahan produksi dari Lapangan Kedung Keris.

Kontan, Page-14, Thursday, Dec 19, 2020

Oil and Gas Production at Kedung Keris Field is 5,000 Barrels



The Kedung Keris Block in Cepu Block operated by ExxonMobil Cepu Ltd continues to produce. At present, the total production reaches 5,000 barrels per day (BPH).

The Kedung Keris Block in Cepu Block

"Kedung Keris Field production achievements continue to increase. Previously the production point was 3,800 BPH, now it has risen to 5,000 BPH, "said Dwi Soetjipto, Head of the Special Work Unit (SKK) for Oil and Gas, in remarks at the inaugural oil production at the Kedung Keris Field, in the hall of the Banyu Urip Field Sport Hall, Gayam District, Tuban.



Dwi said the Kedung Keris Field production figures were not stagnant, but would continue to be boosted until the oil produced continued to increase.

"The production target is expected to reach 10,000 BPH," Dwi said.

He explained, the source of oil was in the villages of Leran and Sukoharjo. Kalitidu Sub-district is expected to increase domestic production. So that it can reduce imports in the coming year. 

      Related to the overall Cepu Block production, Dwi hopes to produce 230 thousand BPH, with details of the Banyu Urip Field 220 thousand BPH and the Kedung Keris Field 10 thousand BPH.

"Although the Kedung Keris field has been able to produce, we have not been able to produce 230 thousand BPH, because the Environmental Impact Analysis permit (EIA/AMDAL) is still 220 thousand BPH. The solution will be taken care of." Dwi's promise

Important Role

Louise McKenzie

Meanwhile. ExxonMobil President Louise McKenzie expressed pride in the oil products in the Cepu block. Because, and 25 percent of the national oil demand comes from the Banyu Urip field and later it can be more if added to the Kedung Keris field.

the Banyu Urip field

"I am proud that the Cepu block can help domestic oil needs, as much as 25 percent," he said.

At present, the amount of domestic fuel oil needs is 1.5 million BPH. 60 percent of the needs can be fulfilled domestically, while the rest is obtained from imports.

IN INDONESIA

Produksi Minyak dan Gas Lapangan Kedung Keris 5.000 Barel


Lapangan Kedung Keris Blok Cepu yang dioperatori ExxonMobil Cepu Ltd terus melakukan produksi. Saat ini total produksinya mencapai 5.000 barel per hari (BPH). 

“Capaian produksi Lapangan Kedung Keris terus meningkat. Sebelumnya titik produksi 3.800 BPH, kini sudah naik menjadi 5.000 BPH," kata Dwi Soetjipto, Kepala Satuan Kerja Khusus (SKK) Migas, dalam sambutan produksi minyak perdana Lapangan Kedung Keris, di aula Sport Hall Lapangan Banyu Urip, Kecamatan Gayam, Tuban.

Dikatakan Dwi angka produksi Lapangan Kedung Keris tidak stagnan, melainkan akan terus digenjot hingga minyak yang dihasilkan terus meningkat. 

"Target produksinya diharapkan bisa mencapai 10 ribu BPH," ujar Dwi.

Dia menjelaskan, sumber minyak yang berada di Desa Leran dan Sukoharjo. Kecamatan Kalitidu ini diharapkan bisa menambah produksi dalam negeri. Sehingga mampu mengurangi impor di tahun mendatang. 

     Terkait produksi Blok Cepu secara keseluruhan, Dwi berharap bisa memproduksi 230 ribu BPH, dengan rincian Lapangan Banyu Urip 220 ribu BPH dan Lapangan Kedung Keris 10 ribu BPH.

"Meski lapangan Kedung Keris sudah bisa produksi, namun kita belum bisa memproduksi 230 ribu BPH, karena izin analisis dampak lingkungan (AMDAL) masih 220 ribu BPH. Solusinya akan diurus izinnya." janji Dwi 

Peran Penting

Sementara itu. Presiden ExxonMobil, Louise McKenzie menyatakan bangga dengan produk minyak di blok Cepu. Sebab, dan kebutuhan minyak nasional 25 persennya berasal dan lapangan Banyu Urip dan nanti bisa lebih jika ditambah dengan lapangan Kedung Keris.

"Saya bangga blok Cepu bisa membantu kebutuhan minyak dalam negeri, sebanyak 25 persen” ungkapnya.

Saat ini jumlah kebutuhan Bahan Bakar Minyak (BBM) dalam negeri 1,5 juta BPH. 60 persen kebutuhan mampu dicukupi dalam negeri, sedangkan sisanya diperoleh dari impor.

Surya, Page- 3, Wednesday, Dec 18, 2019

EMCL Production Towards 10 Thousand Barrels



The Cepu Block oil production has increased. Because, ExxonMobil Cepu Limited (EMCL) officially started oil production in the Kedung Keris field.

the Kedung Keris field

     EMCL has also submitted a revised analysis on the environmental impact (EIA) of the increased production. 

Dwi Soetjipto

    Head of the Special Task Force for Upstream Oil and Gas Business Activities (SKK Migas) Dwi Soetjipto said oil production at the Kedung Keris field currently reaches 5,000 barrels of oil per day. Later, gradually, its capacity will increase to 10 thousand barrels of oil per day.

"If calculated with the price of ICP oil (Indonesian crude oil price) of USD 60-USD 65 per barrel, there will be gross revenue of USD 237 million or equivalent to Rp 3.3 trillion a year," Dwi explained before the media.

The income according to Dwi Soetjipto is not exactly small. Dwi Soetjipto believes that the revenue will contribute significantly to the regional and central economy. Currently, the Cepu Block production from the Banyu Urip field reaches 220 thousand barrels of oil per day. 

Chevron Pacific Indonesia

     That is the most contribution. Previously, the highest oil production was produced by the Rokan Block which is managed by Chevron Pacific Indonesia. The figure is around 210 thousand barrels of oil per day.

"But, overtaken EMCL which is more than 200 thousand barrels of oil per day. In fact, Rokan's production has dropped to 190 thousand barrels," Dwi said. Because the production capacity of the Cepu Block has changed, EMCL needs to revise the Environmental Impact Analysis (AMDAL). Based on the results of the maximum capacity trial test, the production of 235 thousand barrels of oil per day (BPD) is still safe.

"The test has been done. Still waiting to get permission to operate at that level," Dwi said.

Louise McKenzie

ExxonMobil Cepu Limited President Louise McKenzie revealed oil production in the Cepu Block contributed 25 percent to the nation.

"Number one in Indonesia. Therefore, we will continue to produce" he said.

While waiting for the drop in environmental impact analysis to increase production to 235 thousand barrels of oil per day, he has prepared facilities that are in line with the production capacity at the Kedung Keris field, which has reached 10 thousand barrels. 

     The oil production activities of the Kedung Keris project are a collaboration between ExxonMobil Cepu Limited (EMCL) and Cepu Block partners. Namely, PT Pertamina EP Cepu (PEPC) and the Cepu Block Participating Interest (PI) Cooperation Agency.

"We will continue to evaluate the capability and performance of the Kedung Keris well," McKenzie said.

The engineering, procurement, and construction contract of the Kedung Keris project with an investment of up to USD 76 million were undertaken by PT Meindo Elang Indah. The project consists of a tread for one well operation and an 8-inch diameter underground pipe. 

Banyu Urip central processing facility

     The pipe extends along 15 kilometers and is connected with a Banyu Urip central processing facility. Head of East Java ESDM Office Setiadjit emphasized that the East Java Provincial Government is ready to support increased oil production in the region.

"If there is a submission for making EIA due to increased production, we will facilitate and accelerate" he explained.

IN INDONESIA

Produksi EMCL Menuju 10 Ribu Barel


Produksi minyak Blok Cepu meningkat. Sebab, ExxonMobil Cepu Limited (EMCL) resmi memulai produksi minyak di lapangan Kedung Keris. EMCL juga sudah mengajukan revisi analisis mengenai dampak lingkungan (amdal) atas peningkatan produksi tersebut. 

     Kepala Satuan Kerja Khusus Kegiatan Usaha Hulu Minyak dan Gas Bumi (SKK Migas) Dwi Soetjipto menyebutkan, produksi minyak di lapangan Kedung Keris saat ini mencapai 5.000 barel minyak per hari. Nanti, secara bertahap, kapasitasnya meningkat menjadi 10 ribu barel minyak per hari.

"Kalau dihitung dengan harga minyak ICP (harga minyak mentah Indonesia) USD 60-USD 65 per barel, akan ada pendapatan kotor atau gross revenue USD 237 juta atau setara Rp 3,3 triliun setahun,” terang Dwi di hadapan media.

Pendapatan tersebut menurut Dwi Soetjipto tidak bisa dibilang sedikit. Dwi Soetjipto yakin pendapatan itu bakal berkontri busi signifikan terhadap perekonomian daerah dan pusat. Saat ini produksi Blok Cepu dari lapangan Banyu Urip mencapai 220 ribu barel minyak per hari. Itulah kontribusi yang paling banyak. Sebelumnya, produksi minyak tertinggi dihasilkan Blok Rokan yang dikelola Chevron Pacific Indonesia. Angkanya berkisar 210 ribu barel minyak per hari.

"Tapi, disalip EMCL yang lebih dari 200 ribu barel minyak per hari. Bahkan, produksi Rokan turun menjadi 190 ribu barel" tegas Dwi Lantaran kapasitas produksi Blok Cepu berubah, EMCL perlu merevisi Analisis Dampak Lingkungan (AMDAL). Berdasar hasil tes uji coba kapasitas maksimal, produksi 235 ribu barel minyak per hari masih aman. 

"Tes sudah dilakukan. Masih menunggu mendapatkan izin beroperasi di level itu" ujar Dwi.

Presiden ExxonMobil Cepu Limited Louise McKenzie mengungkapkan, produksi minyak di Blok Cepu berkontribusi 25 persen terhadap nasional. 

"Nomor satu di Indonesia. Karena itu, kami bakal terus melanjutkan produksi" tuturnya.

Sambil menunggu turunnya izin amdal pada peningkatan produksi menjadi 235 ribu barel minyak per hari, dia sudah menyiapkan fasilitas yang sesuai dengan kemampuan produksi di lapangan Kedung Keris yang mencapai 10 ribu barel. Kegiatan produksi minyak dari proyek Kedung Keris merupakan kerja sama antara ExxonMobil Cepu Limited (EMCL) dan para mitra Blok Cepu. Yakni, PT Pertamina EP Cepu dan Badan Kerja Sama Participating Interest (PI) Blok Cepu.

"Kami akan terus mengevaluasi kemampuan dan kinerja dari sumur Kedung Keris" kata McKenzie.

Kontrak rekayasa, pengadaan, dan konstruksi proyek Kedung Keris dengan nilai investasi mencapai USD 76 juta dikerjakan PT Meindo Elang Indah. Proyek itu terdiri atas tapak sumur untuk operasi satu sumur dan pipa bawah tanah berdiameter 8-inci. Pipa tersebut menjulur sepanjang 15 kilometer dan tersambung dengan fasilitas pengolahan pusat Banyu Urip. Kepala Dinas ESDM Jatim Setiadjit menegaskan, Pemprov Jatim siap mendukung peningkatan produksi minyak di wilayahnya. 

"Jika ada pengajuan pembuatan amdal karena peningkatan produksi, kami bakal fasilitasi dan percepat" jelasnya.

Jawa Pos, Page- 5, Wednesday, Dec 18, 2019

The Kedung Keris Project makes the biggest oil-producing Cepu Block



ExxonMobil Cepu Limited (EMCL) commenced the operation of the Kedung Keris Field, Cepu Block with peak production of 10 thousand barrels per day (BPD). This field will strengthen the position of the Cepu Block as the largest oil producer in Indonesia, shifting the position of the Rokan Block which is worked on by PT Chevron Pacific Indonesia (CPI).

PT Chevron Pacific Indonesia (CPI)

Cepu, we have increased oil production. Hopefully next year there will be an additional 10 thousand BPD, so the difference in production will be further increased compared to Rokan, "said Head of the Special Task Force for Upstream Oil and Gas Business Activities (SKK Migas) Dwi Soetjipto when inaugurating the operation of the Kedung Keris Field.

The Rokan Block

The Rokan Block currently produces around 190 thousand BPD of oil. While Cepu Block's production is around 219 thousand BPD. Next year, the production of the Rokan Block is projected to fall because before the contract expires. On the contrary, oil production from the Cepu Block is getting higher with the operation of the Kedung Keris Field.

Louise McKenzie

The existence of the Kedung Keris project can even increase the production of the Cepu Block to 235 thousand BPD. ExxonMobil Cepu Limited President Louise McKenzie added that the Kedung Keris Field had been producing oil since November 22, ahead of schedule. At present oil production from this field is still around 5,000 BPD and will increase gradually until it reaches a peak of 10,000 BPD.

the Cepu Block

"This production will help maintain the average production of the Cepu Block which currently produces more than 25% of the national oil production which also makes ExxonMobil the number one oil producer in Indonesia," Louise McKenzie said.

EPC Kedung Keris Field Bojonegoro

The Engineering, Procurement, and Construction (EPC) contract of the Kedung Keris Project was carried out by PT Meindo Elang Indah, a local Indonesian company. The project with an investment value of US $ 76 million consists of a well site for the operation of one well and an 8-inch 8-inch underground pipeline connected to the Banyu Urip Central Processing Facility.

Kedung Keris Field BY EXXONMOBIL

Kedung Keris Field was discovered in 2011, about 15 kilometers east of the Banyu Urip Field. Based on the current evaluation, oil reserves from the Kedung Keris Field are estimated to reach 20 million barrels of oil. The two fields are located in the Cepu Block, where ExxonMobil Cepu Limited acts as the operator.

Dwi Soetjipto

Dwi continued, from the maximum production trial results, the Cepu Block production facility could produce oil up to 235 thousand BPD in safe conditions. However, the increase in production of the Cepu Block is still awaiting approval of the revised Environmental Impact Analysis (EIA). The reason is that the Amdal currently only lists a maximum production of 220 thousand BPD. Therefore, he hopes the local government can help facilitate the provision of EIA recommendations related to changes in production figures.

"It was concluded that production of 235 thousand BPD was in a safe position. Now how do we get permission to operate at that level," Dwi said.

the Banyu Urip Field

It will continue to help ExxonMobil to continue to increase production and increase exploration. As long as the Amdal revision approval has not yet been obtained, oil production from the Banyu Urip Field must be reduced following the operation of the Kedung Keris Field. This is so operating activities Cepu Block does not violate the existing EIA.

Oil production from the two fields can only be optimized after the new AMDAL is approved. Thus, his party could not be sure when the Kedung Keris Field reached peak production. However, the production of the Cepu Block did not necessarily be boosted to reach 235 thousand BPD.

"When we operate [Cepu Block], we will pay attention to various things, including facilities, reservoirs, etc. For running at 235 thousand BPD, it is not certain. We must pay attention to everything," Dwi said.

McKenzie added, the EIA approval process was still in progress. Not long ago, it has held a technical study with the Ministry of Environment and Forestry (KLHK). Furthermore, his party will carry out community studies.

"This process has many stages, but it is hoped that [EIA] will come out within a month or two," he said.

Strengthen the Region

According to Dwi, the operation of the Kedung Keris Field will generate a gross income of around Rp 3.3 trillion per year. But not only that, if it continues, this gross income will also contribute to the economic conditions of the country and the region. In addition, increasing oil and gas production in the East Java region is also important to meet the energy needs in this region. Because the industry in East Java is growing very high.

After East Java has become the largest oil-producing region in Indonesia, it will also boost gas production in this region. At present oil production in this region reaches more than 25% of national production.

"We are making arrangements to be able to meet the needs of gas in East Java, there are projects in the Madura Strait. So we emphasize to meet the needs of East Java. Hopefully, it will not disturb investors in East Java," Dwi said.

The Head of the East Java Office of Energy and Mineral Resources (ESDM) Setiaji appreciated the commencement of oil production from the Kedung Keris Field. Moreover, this operation boosts oil production in its region to 305 thousand BPD. The realization of this production reaches around more than 30% of national production.

He hopes that if there are still new fields that can be offered, the company can work on the oil and gas field. This is to encourage oil and gas production in East Java. On the contrary, it promises convenience for oil and gas companies.

"Maybe there are new licenses and Amdal, if there are difficulties, we ask that we can come and we will facilitate and speed up," said Setiaji.
Referring to SKK Migas data, this year, Cepu Block oil lifting is targeted at 216 thousand BPD. Until the end of September, the realization of Cepu Block oil lifting has exceeded the target, which is 216,011 thousand BPD. This Cepu Block oil production increased compared to the end of last year of 209 thousand BPD.

Meanwhile, the amount of reserves that can be produced (recoverable reserve) in the Cepu Block is currently recorded at 823 million barrels. This reserve is higher than initially estimated in the development plan (POD) of 450 million barrels.

IN INDONESIA

Proyek Kedung Keris Jadikan Blok Cepu Penghasil Minyak Terbesar


ExxonMobil Cepu Limited (EMCL) memulai pengoperasian Lapangan Kedung Keris, Blok Cepu dengan puncak produksi 10 ribu barel per hari (bph). Lapangan ini akan memperkuat posisi Blok Cepu sebagai penghasil minyak terbesar di Indonesia, menggeser posisi Blok Rokan yang digarap PT Chevron Pacific Indonesia (CPI).

Cepu, kita punya produksi minyak meningkat. Semoga tahun depan bisa tambahan 10 ribu bph maka bedanya produksi semakin jauh meningkat dibandingkan Rokan," kata Kepala Satuan Kerja Khusus Pelaksana Kegiatan Usaha Hulu Minyak dan Gas Bumi (SKK Migas) Dwi Soetjipto ketika meresmikan beroperasinya Lapangan Kedung Keris.

Blok Rokan saat ini memproduksi minyak sekitar 190 ribu bph. Sementara produksi Blok Cepu sekitar 219 ribu bph. Tahun depan, produksi Blok Rokan diproyeksikan turun lantaran menjelang kontrak berakhir. Sebaliknya, produksi minyak dari Blok Cepu semakin tinggi dengan telah beroperasinya Lapangan Kedung Keris. 

Keberadaan proyek Kedung Keris bahkan bisa meningkatkan  produksi Blok Cepu sampai 235 ribu bph. Presiden ExxonMobil Cepu Limited Louise McKenzie menambahkan, Lapangan Kedung Keris telah menghasilkan minyak sejak 22 November lalu, lebih cepat dari jadwal. Saat ini produksi minyak dari lapangan ini masih sekitar 5 ribu bph dan akan naik bertahap hingga mencapai puncak produksi 10 ribu bph.

"Produksi ini akan membantu mempertahankan rata-rata produksi Blok Cepu yang saat ini menghasilkan minyak lebih dari 25% dari produksi minyak nasional yang juga menjadikan ExxonMobil produsen minyak nomor satu di Indonesia," Kata Louise McKenzie.

Kontrak rekayasa, pengadaan dan konstruksi (engineering, procurement, and construction/EPC) Proyek Kedung Keris dilaksanakan PT Meindo Elang Indah, perusahaan lokal Indonesia. Proyek dengan nilai investasi US$ 76 juta terdiri dari tapak sumur untuk operasi satu sumur dan pipa bawah tanah berdiameter 8 inch sepanjang 15 kilometer yang tersambung dengan Fasilitas Pengolahan Pusat Banyu Urip. 

Lapangan Kedung Keris ditemukan pada 2011, sekitar 15 kilometer sebelah timur Lapangan Banyu Urip. Berdasarkan evaluasi saat ini, diperkirakan cadangan minyak dari Lapangan Kedung Keris mencapai 20 juta barel minyak. Kedua lapangan tersebut terletak di Blok Cepu, di mana ExxonMobil Cepu Limited bertindak sebagai operator.

Dwi melanjutkan, dari hasil uji coba produksi maksimal, fasilitas produksi Blok Cepu bisa menghasilkan minyak hingga 235 ribu bph dalam kondisi aman. Namun, peningkatan produksi Blok Cepu ini masih menunggu persetujuan revisi Analisis Dampak Lingkungan (Amdal). Pasalnya, Amdal yang ada saat ini hanya mencantumkan produksi maksimal sebesar 220 ribu bph. Karenanya, pihaknya berharap pemerintah daerah setempat dapat membantu mempermudah pemberian rekomendasi Amdal terkait perubahan angka produksi tersebut.

"Disimpulkan produksi 235 ribu bph dalam posisi aman. Sekarang bagaimana kita mendapat izin untuk beroperasi di level itu," ujar Dwi.

Pihaknya sendiri akan terus membantu ExxonMobil untuk terus menambah produksi dan meningkatkan eksplorasi. Selama belum memperoleh persetujuan revisi Amdal, maka produksi minyak dari Lapangan Banyu Urip terpaksa diturunkan menyusul beroperasinya Lapangan Kedung Keris. Hal ini agar kegiatan operasi di Blok Cepu tidak melanggar Amdal yang ada. 

Produksi minyak dari kedua lapangan baru dapat dioptimalkan setelah Amdal yang baru disetujui. Sehingga, pihaknya tidak dapat memastikan kapan Lapangan Kedung Keris mencapai puncak produksi. Meski demikian, produksi Blok Cepu disebutnya tidak lantas digenjot mencapai 235 ribu bph.

"Pada saat kami mengoperasikan [Blok Cepu] akan memperhatikan berbagai hal baik fasilitas, reservoir, dan lain sebagainya. Untuk running di 235 ribu bph, belum tentu. Kami harus perhatikan semuanya," ujar Dwi.

McKenzie menambahkan, proses pengajuan persetujuan Amdal masih berlangsung. Belum lama ini, pihaknya telah menggelar kajian teknis dengan Kementerian Lingkungan Hidup dan Kehutanan (KLHK). Selanjutnya pihaknya akan melaksanakan kajian masyarakat.

"Proses ini ada banyak tahapan, tetapi harapannya [Amdal] akan keluar dalam satu atau dua bulan ini," tutur dia.

Perkuat Daerah

Menurut Dwi, pengoperasian Lapangan Kedung Keris akan menghasilkan penghasilan kotor sekitar Rp 3,3 triliun per tahun. Namun tidak hanya itu, jika terus berjalan, pendapatan kotor ini juga akan memberi kontribusi pada kondisi ekonomi negara dan daerah. Selain itu, peningkatan produksi migas di wilayah Jawa Timur juga penting untuk memenuhi kebutuhan energi di wilayah ini. Pasalnya, industri di Jawa Timur tumbuh sangat tinggi. 

Setelah Jawa Timur menjadi daerah produsen minyak terbesar di Indonesia, pihaknya juga akan turut menggenjot produksi gas di wilayah ini. Saat ini produksi minyak di wilayah ini mencapai lebih dari 25% produksi nasional.

"Kami sedang melakukan pengaturan agar dapat memenuhi kebutuhan gas di Jatim, ada proyek di Selat Madura. Maka kami tekankan untuk memenuhi kebutuhan Jawa Timur. Semoga tidak mengganggu investor di Jawa Timur," kata Dwi.

Kepala Dinas Energi dan Sumber Daya Mineral (ESDM) Jawa Timur Setiaji mengapresiasi dimulainya produksi minyak dari Lapangan Kedung Keris. Apalagi, pengoperasian ini mendongkrak produksi minyak di wilayahnya menjadi 305 ribu bph. Realisasi produksi tersebut mencapai sekitar lebih dari 30% dari produksi nasional. 

Pihaknya berharap, jika memang masih ada lapangan baru yang bisa ditawarkan, perusahaan dapat menggarap lapangan migas tersebut. Hal ini untuk mendorong produksi migas di Jatim. Sebaliknya, pihaknya menjanjikan kemudahan bagi perusahaan migas.

"Barang kali ada perizinan dan Amdal baru, kalau ada kesulitan, kami mohon untuk dapat datang akan kami fasilitasi dan percepat," kata Setiaji.

Mengacu data SKK Migas, pada tahun ini, lifting minyak Blok Cepu ditargetkan sebesar 216 ribu bph. Sampai akhir September lalu, realisasi lifting minyak Blok Cepu tercatat telah melampaui target, yakni sebesar 216.011 ribu bph. Produksi minyak Blok Cepu ini naik dibandingkan realisasi sampai akhir tahun lalu sebesar 209 ribu bph.

Sementara itu, besaran cadangan yang dapat diproduksikan (recoverable reserve) di Blok Cepu saat ini tercatat mencapai 823 juta barel. Cadangan ini lebih tinggi dari yang awalnya diperkirakan dalam rencana pengembangan (plan of development/POD) sebesar 450 juta barel.

Investor Daily, Page- 9, Wednesday, Dec 18, 2019

Thursday, January 16, 2020

Supertanker Supports Energy Security



The operation of supertankers for loading and unloading oil and gas is important for energy security. The distribution of large volumes of oil and gas through the sea, after being exploited and produced on land, is more efficient and efficient using supertankers. 

      In 2019, up to the first semester, national oil production will be 752,000 barrels per day (BPD) or 97 percent of the national target. Of the 725,000 BPD, ExxonMobil's 220,000 BPD was produced from the Banyu Urip Field, which will soon add 10,000 BPD from the Kedung Keris Field in Bojonegoro, East Java.

the Banyu Urip Field ExxonMobil

Oil from Bojonegoro has flowed through a 72 kilometer (km) pipeline to a facility in Palang, Tuban, East Java. Subsequently, it will be channeled again 23 km through an underwater pipeline to the mooring tower, the location of the Gagak Rimang Floating Storage and Storage (FSO) loading ship. If the 2.1 million barrels of oil supertanker is disrupted, the field cannot continue production.

FSO Gagak Rimang

"In the production-ready for sale or lifting oil from the field depends on the readiness of ships such as FSO Gagak Rimang," said SKK Business Support Specialist Migas Jabanusa (Java Bali Nusa Tenggara) Ami Hermawati in Kompas Talk at Kompas Editor in Surabaya, East Java.

The Banyuurip Field

The discussion with the theme "The Role of Floating Storage and Offloading / Crowding Rimang FSO as Supporting Banyu Urip Field Operations for National Energy Security" presented speakers from ExxonMobil Cepu Limited (EMCL), SKK Migas (Special Work Unit for Implementing Upstream Oil and Gas Business Activities), and University academics Airlangga, and Surabaya State Shipping Polytechnic (PPNS).

ExxonMobil Offshore Installation Manager Singgih Sugiharto added that the first oil transfer from FSO Gagak Rimang to the buyer's supertankers took place in April 2015. The ship with a deadweight of 302,000 DWT or included in the VLCC (very large crude carrier) category had done 512 liftings.

     That is a month of 11-12 times the loading and unloading of oil from Crow Rimang which has 17 tanks to other ships. Gagak Rimang only serves the transfer of oil to 50,000-300,000 DWT supertankers. The distribution of oil from the field to the mooring tower and FSO Gagak Rimang requires at least 18 hours. Oil from Crow Bimang is taken by large ships that ship to domestic refineries, namely Dumai, Plaju, Cilacap, Balikpapan, and Balongan.

Energy Resistance

Unair Vice Dean of the Faculty of Economics and Business Unair Rudi Purwono said the reliability of production in the Cepu Block and the FSO Gagak Rimang operation determines the resilience of the national energy system. If disturbed, 220,000 BPD of oil will be late to the public. The issue of energy availability is very sensitive.

"On the other hand, oil consumption is still 1.5 million barrels so that Indonesia is forced to import. Don't let the import balance increase because consumption rises, "said Rudi.

If imports expand, energy security is threatened. PPNS Director Eko Julianto said the existence of FSO Gagak Rimang shows that the sea is still the future of energy production and distribution. Marine technology education institutions should welcome it by preparing skilled and competent graduates so they can fulfill the qualifications to work on the supertanker ships. At oil lifting locations, maneuvering of fishing vessels could jeopardize the transfer of inter-ship oil from FSO Gagak Rimang to other supertankers.

"With a length of 330 meters, the ship requires a broad sterile radius for maneuver. Likewise, the buyer ships, "said Singgih.

At least 500 meters from the radius of FSO Gagak Rimang must be sterile from fishing activities. Therefore the temperature of the oil pipe is warm and light bright in the Crow Rimang installation in the middle of the sea, the location was a place for fish to gather. The condition also made the fishermen join in searching for fish near the installation in the sea.

IN INDONESIA

Supertanker Menunjang Ketahanan Energi


Pengoperasian supertanker untuk bongkar muat minyak dan gas penting bagi ketahanan energi. Distribusi migas bervolume besar melalui laut, setelah dieksploitasi dan diproduksi di darat, lebih efisien dan hemat menggunakan supertanker. Tahun 2019, hingga lewat semester I, produksi minyak nasional 752.000 barel per hari (bph) atau 97 persen target nasional. 

     Dari 725.000 bph itu, sebesar 220.000 bph dihasilkan ExxonMobil dari Lapangan Banyu Urip, yang segera akan bertambah 10.000 bph dari Lapangan Kedung Keris di Bojonegoro, Jawa Timur.

Minyak dari Bojonegoro itu dialirkan melalui pipa sepanjang 72 kilometer (km) ke fasilitas di Palang, Tuban-Jawa Timur. Selanjutnya, dialirkan lagi 23 km lewat pipa bawah laut ke mooring tower, lokasi tertambatnya kapal alir muat Floating Storage and Offloading/FSO) Gagak Rimang. Jika supertanker berkapasitas 2,1 juta barel minyak itu terganggu, lapangan tak bisa melanjutkan produksi.

”Keandalam produksi siap jual atau lifting minyak dari lapangan bergantung kesiapan kapal seperti FSO Gagak Rimang,” kata Spesialis Dukungan Bisnis SKK
Migas Jabanusa (Jawa Bali Nusa Tenggara) Ami Hermawati dalam Bincang Kompas di Redaksi Kompas Biro Surabaya, Jawa Timur.

Diskusi bertema ”Peran Floating Storage and Offloading/FSO Gagak Rimang sebagai Penunjang Operasi Lapangan Banyu Urip untuk Ketahanan Energi Nasional” itu menghadirkan narasumber dari ExxonMobil Cepu Limited, SKK Migas (Satuan Kerja Khusus Pelaksana Kegiatan Usaha Hulu Minyak dan Gas Bumi), serta akademisi Universitas Airlangga, dan Politeknik Perkapalan Negeri Surabaya (PPNS).

Manajer Instalasi Lepas Pantai ExxonMobil Singgih Sugiharto menambahkan pemindahan minyak perdana dari FSO Gagak Rimang ke supertanker pembeli terjadi April 2015. Kapal berbobot mati 302.000 DWT atau masuk kategori VLCC (very large crude carrier) ini sudah melakukan 512 lifting. Artinya, sebulan terjadi 11-12 kali bongkar muat minyak dari Gagak Rimang yang memiliki 17 tangki ke kapal-kapal lain. 

    Gagak Rimang hanya melayani pemindahan minyak ke supertanker 50.000-300.000 DWT. Penyaluran minyak dari lapangan ke mooring tower dan FSO Gagak Rimang setidaknya perlu 18 jam. Minyak dari Gagak Bimang diambil kapal-kapal besar yang mengirim ke kilang-kilang domestik, yakni Dumai, Plaju, Cilacap, Balikpapan, dan Balongan.

Ketahanan Energi 

Wakil Dekan Fakultas Ekonomika dan Bisnis Unair Rudi Purwono mengatakan, keandalan produksi di Blok Cepu dan operasional FSO Gagak Rimang menentukan ketangguhan sistem energi nasional. Jika terganggu, 220.000 bph minyak akan terlambat sampai ke masyarakat. Isu ketersediaan energi sangat sensitif. 

”Di sisi lain, konsumsi minyak masih 1,5 juta barel sehingga Indonesia terpaksa mengimpor. Jangan sampai neraca impornya membesar karena konsumsi naik,” kata Rudi. 

Jika impor membesar, ketahanan energi terancam. Direktur PPNS Eko Julianto mengatakan, keberadaan FSO Gagak Rimang memperlihatkan bahwa laut masih masa depan produksi dan distribusi energi. Lembaga pendidikan teknologi kelautan patut menyambutnya dengan menyiapkan lulusan yang ahli dan kompeten sehingga bisa memenuhi kualifikasi berkarya di kapal-kapal supertanker itu. Di lokasi lifting minyak, manuver kapal-kapal nelayan bisa membahayakan pemindahan minyak antar-kapal dari FSO Gagak Rimang ke supertanker lain. 

”Dengan panjang 330 meter, kapal memerlukan radius steril luas untuk manuver. Begitu juga kapal-kapal pembeli,” kata Singgih. 

Setidaknya, 500 meter dari radius FSO Gagak Rimang harus steril dari aktivitas penangkapan ikan. Oleh karena suhu pipa minyak yang hangat dan cahaya terang di instalasi Gagak Rimang di tengah laut, lokasi itu menjadi tempat ikan berkumpul. Kondisi itu juga membuat para nelayan turut mencari ikan di dekat instalasi di laut tersebut.

Kompas, Page-15, Wednesday, 11 Dec 2019